Visual merchandising props / JT-008

Cosmetic counter display panel

Counter display panel with branded graphics and openings for product presentation Choose acrylic, PVC foam board, rigid PVC board or black PVC board for the display panel according to product weight, cut-outs and the desired finish. Print or apply the branded graphics, cut openings to fit the products, and assemble the support and base. Confirm load, board thickness and surface finish. The photo shows a product format, not proof that every listed material was used. Confirm the actual substrate, thickness, structure and finish for each project.

Use
Retail & counters
Delivery format
Custom project
Material route
Acrylic / PVC foam board / Rigid PVC board / Black PVC board

Quote within 30 minutes during quotation hours (Mon–Fri 9:00–22:00)

Production generally takes 2–3 working days. Delivery and installation are scheduled separately.

Installation can be arranged throughout Malaysia. Scope, cost and dates are confirmed for each project.

Final materials, dimensions, accessories and schedule follow the sample and quotation.

Prepare your enquiry
01 / Product information

Production & configuration

Counter display panel with branded graphics and openings for product presentation Choose acrylic, PVC foam board, rigid PVC board or black PVC board for the display panel according to product weight, cut-outs and the desired finish. Print or apply the branded graphics, cut openings to fit the products, and assemble the support and base. Confirm load, board thickness and surface finish. The photo shows a product format, not proof that every listed material was used. Confirm the actual substrate, thickness, structure and finish for each project.

Print or apply the branded graphics, cut openings to fit the products, and assemble the support and base. Confirm load, board thickness and surface finish.

Material options

  • Acrylic
  • PVC foam board
  • Rigid PVC board
  • Black PVC board

Choose acrylic, PVC foam board, rigid PVC board or black PVC board for the display panel according to product weight, cut-outs and the desired finish.

How it is made

Print or apply the branded graphics, cut openings to fit the products, and assemble the support and base. Confirm load, board thickness and surface finish.

Photo note

The photo shows a product format, not proof that every listed material was used. Confirm the actual substrate, thickness, structure and finish for each project.

Product family
Countertop displays
Placement
Countertop
Delivery format
Sizes, materials and delivery configurations are quoted by project.

Customisation options

Size and shapeBrand graphics and logoPrinting and colour outputSupport structure
02 / Prepare your enquiry

Details we may ask for on WhatsApp

Start with dimensions, quantity and location. Our Malaysia team will ask about materials, artwork and installation on WhatsApp.

  1. 01Product dimensions
  2. 02Product weight and display load
  3. 03Packing and shipping requirements
  4. 04Required quantity
  5. 05Artwork or reference files
Artwork requirements

Provide artwork or reference files with finished dimensions, cutting outlines and intended placement. Material and finishing are confirmed with the quotation.

Get a quote on WhatsApp ↗

Production, delivery and installation

HGS can arrange installation throughout Malaysia. Share your location, site photos and target completion date so we can confirm the scope and schedule.

Production time
Production generally takes 2–3 working days for standard materials, excluding delivery and installation. Custom projects and large structures are scheduled per requirement.
Delivery time
We confirm transport and estimated arrival using the destination state, postcode, finished size and packing. Transit time is separate from production time.
Installation date
Installation can be arranged throughout Malaysia. Scope, site access, cost and completion date are confirmed for each project.

Print-only jobs are scheduled by material, quantity and finishing. Displays with stands also need assembly and packing checks. Site installation requires separate transport, access and work scheduling.

For an event or shop opening, tell us when delivery or installation must be complete. The team will confirm whether a rush schedule is feasible and agree the dates.

Read the delivery and scheduling guide →
Chat on WhatsApp